Automate Safe Work Management Statements (SWMS)

TekTools provides an easy to use App that enables relevant and fully compliant SWMS to be added to a Job and for workers on that Job to sign and datestamp applicable SWMS using a related Mobile App.

SWMS can be selected from pre-configured Industry relevant templates or built and/or modified to specfic Job/Site circumstances and saved as templates for future re-use as required.

Completed and signed SWMS are securely stored in PDF format against the Jobs to which they relate and can be quickly and easily retrieved whenever needed to prove regulatory compliance.

SPECIAL OFFER - FULL SET OF ELECTRICAL SWMS TEMPLATES FOR JUST $240...NOTHING ELSE TO PAY Contact us to today to learn more about TekTools Online SWMS App and see how we can save your Business time and money and help you to avoid potentially significant penalties.

Occupational Safety and Health Regulations 1996 (regulations), Section 3.143

Employers in WA have an obligation to provide and maintain, as far as practicable, a safe working environment in which their employees are not exposed to hazards.

Safety in Western Australian workplaces is regulated by the Occupational Safety and Health Act 1984 (the OSH Act) and the Occupational Safety and Health Regulations 1996.

Section 3.143 of the regulations requires that all high-risk construction work done, or to be done, at the site must be covered by a Safe Work Method Statement (SWMS). Persons who have day-to-day on-site control of high risk construction work must provide the main contractor with a SWMS or, failing that, the main contractor must prepare the necessary SWMS and keep it up to date.

Any breach of Section 3.143 can result in a first-offence fine of $25,000 for an individual and $50,000 for a company.

Construction work is any work carried out in connection with the construction, alteration, conversion, fitting-out, commissioning, renovation, repair, maintenance, refurbishment, demolition, decommissioning or dismantling of a structure, or preparation of a building site. Under the model WHS Act, the term "demolition" includes "deconstruction".

High risk construction work:

  • involves a risk of a person falling more than 2 meters;
  • is carried out on a telecommunication tower;
  • involves demolition of an element of a structure that is load-bearing;
  • involves demolition of an element of a structure that is related to the physical integrity of the structure;
  • involves, or is likely to involve, disturbing asbestos;
  • involves structural alteration or repair that requires temporary support to prevent collapse;
  • is carried out in or near a confined space;
  • is carried out in or near a shaft or trench deeper than 1.5 m or a tunnel;
  • involves the use of explosives;
  • is carried out on or near pressurised gas mains or piping;
  • is carried out on or near chemical, fuel or refrigerant lines;
  • is carried out on or near energised electrical installations or services;
  • is carried out in an area that may have a contaminated or flammable atmosphere;
  • involves tilt-up or precast concrete;
  • is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians;
  • is carried out in an area of a workplace where there is any movement of powered mobile plant;
  • is carried out in areas with artificial extremes of temperature;
  • is carried out in or near water or other liquid that involves a risk of drowning involves diving work.

Energise and Commission Installation

Install Light Fittings

Installation and Repair of Fibre Optic Cable

Installation of Cables in Confined Space

Installation of Extra Low Voltage Cabling

Installation of Power and Light Cabling

Installation of Power Points

Installation of Submains

Installation of Switchboard Connections

Installation of Switchboards

Installing Ceiling Mounted Lights and Speakers

Isolation and Testing of Energy Sources

Low Voltage Installations Maintenance In Ceiling Spacess

Manual Handling

RCD Injection Testing at the Switchboard

Splicing Fibre Optic Cable (Terminate Joint)e

Testing and Tagging Electrical Equipment

Thermographic Testing at Switchboard

Using Portable Ladders

Working at Heights

Working In Risers

Working On Energised Low Voltage Equipment Apparatus

Working With Elevated Work Platforms

Working within a Switchboard

VIEW A SAMPLE SWMS

Cleaning Roof Gutters

Clear Blocked Drains or Conduct Camera Inspection

Complete Maintenance on Fixtures, Tapware and Appliances

Delivery of Materials

Erect Work Area Safety Barricades

Excavating by Hand and Working in Trenches

Install Copper Pipework in Roof Area

Install or Replace Fixtures Tapware and Appliances

Installation of Copper Pipework

Installation of Drainage

Installation of PVC Pipes

Installation of Sanitary Drainage

Isolate Cut and Seal Plumbing Services

Loading Vehicles

Remove Existing Fixtures and Fittings

Repair Burst Pipe

Working from a Ladder

Working from an Elevated Work Platforms

Working in Confined Space

Working on a Roof